ROYAL WEDDING IN STOCKHOLM » ROYAL 100619 Cranelift
A heavy industrial crane had to be used to lift half a tonne into the air!
At 06.00 in da morning we lifted the heart straight up and onto the facade of the Grand Hotel in Stockholm
A heavy industrial crane had to be used to lift half a tonne into the air!
At 06.00 in da morning we lifted the heart straight up and onto the facade of the Grand Hotel in Stockholm